NASA will be performing network maintenance on Wednesday, November 20, 2024, between 11:00 AM EST and 1:00 PM EST (16:00 to 18:00 UTC). There will be two periods of about five minutes of disruption. During these peroids, the ILRS website will be unavailable during the outages. If you experience problems outside this window, contact support-cddis@nasa.gov.

close window

IGEX 98 CAMPAIGN

mid October ’98 mid January ’99

http://lareg.ensg.ign.fr/IGEX

  • CSTG/IGN/ION
  • First global GLONASS campaign
  • Combined GPS/GLONASS receiver preferred
  • Orbit improvement
  • System transformations (coord/time)
  • Software and Hardware checks
  • Workshop in 1999

Chairperson: Pascal Willis, IGN Paris

IGEX Mail!

Hardware

  • 3S-Navigation R100, GPS(sf)/GLONASS(df)
  • Ashtech Z 18, GPS(df)/GLONASS(df)
  • Ashtech GG24, GPS(sf)/GLONASS(sf)
  • Javad
  • Novatel
  • Trimble

Data

  • RINEX extended for GLONASS
  • RINEX converter programs to be checked
  • Regional and Global Data Centers (parallel to IGS data flow)

Availability of hardware and stations software is critical

Campaign postponed by 1 month to mid-October

Request for SLR Tracking

  • See recent SLRMail
  • 3 x 3 GLONASS Satellites (3 in each plane)
  • including satellites already tracked (excluding one "unhealthy" sat.)
  • 1-2 NP at start, middle, and end of pass